PROJECT NAME: Alameda Square Redevelopment
OWNER: Brighton Corporation
CONTRACTOR: Brighton Corporation
LOCATION: Alameda Ave. & Zuni, Denver, CO
FACILITY TYPE: Retail Buildings
REFERENCE: David Kodanko (208) 841-6067

PROJECT BACKGROUND:  Colorado Cleanup Corporation was retained by Brighton Corporation to perform the demolition and earthwork services for three buildings to make room for a future Lowe's store.  The deconstruction of the structures of the property totaled 200,000 square feet, including a separation to the remaining structure. 15,000 cubic yards of concrete and asphalt were crushed on site for future road base for the project. The bedrock was ripped and 50,000 cubic yards of unsuitable fill and imported 45,000 cubic yards of structural fill.
SCOPE OF WORK: Utility Disconnects, Acquire all demolition permits, Demolished structures totaling 200,000 sf.; including a  separation to the remaining structure.  Crushed 15,000 cubic yards of concrete and asphalt for future road base for the project.  Ripped Bedrock, Exported 50,000 CY of unsuitable fill and imported 45,000 CY of structural fill.  Removed and consolidated asbestos contaminated concrete.  Kept clean recycling piles separate.

  • Denver Broncos Field at Mile High

    Denver Broncos Field at Mile High

    Colorado Cleanup Corp. performed the earthwork for the new Bronco’s Stadium which included the removal of existing landfill materials on top of which the old Mile High stadium was built. Total contract = $12,000,000.00

    Read More

  • Hewlett-Packard

    Hewlett-Packard

    This building was a massive demolition of a former two-building manufacturing plant for Hewlett Packard. The two buildings that were built in 1979 was built for a Digital Equipment Corp. to manufacture high-capacity disk drives, that were used in main frame computers.

    Read More

  • Gates Rubber Factory

    Gates Rubber Factory

    CCC was contracted to demolish Gates Rubber Plant at Broadway & I-25 making the site more marketable for redevelopment. CCC demolished four structures totaling over one million square feet of an industrial manufacturing facility in Denver.

    Read More

to top